European Companies Search Engine
EU funding (€24.8M): Next Generation 12+MW Rated, Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity Hor1 May 2018 EU Research and Innovation programme "Horizon"
Overview
Text
Next Generation 12+MW Rated, Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity
The ReaLCoE consortium is happy to submit a well-prepared proposal, founded on a highly experienced and tight-knit group in discussion since early 2017. ReaLCoE aims to accelerate a new generation of competitive and subsidy free clean energy from offshore wind energy converters (WEC) with a high performance 12+MW demonstration turbine. Our WEC technology platform developments are designed to be competitive and scalable, consolidating scientific knowledge and operational experience for a swift evolution towards 14-16 MW rated capacities. Today, only less than 30% of the cost for electricity from large offshore wind energy converters incur from the turbine itself. ReaLCoE will work to optimise innovation across the whole value chain; from initial turbine design to equipment handling in the port, to testing, financing installation and the final customer to substantially reduce the Levelised Cost of Electricity (LCoE) of offshore wind. The consortium is led by a pioneer in the sector, Senvion, who has brought together some of Europe’s most experienced and talented actors in both on- and offshore wind energy to demonstrate a 12+MW WEC. After a period of strong market consolidation, Senvion and its partners aim to jointly enter a competitive market of offshore wind energy in the 12+MW turbine class. We are confident that ReaLCoE will have a global impact on offshore wind energy market, reinforcing Europe’s technological leadership and bringing growth and job opportunities to the industrial base. Not only in the wind energy sector through the manufacturing, installation and operation of 12+MW WEC in a competitive environment; but also through the provision of cheap, clean energy across an integrated system of renewables. This paves the way for a turbine generation with rated capacities of 14-16MW and triggers hundreds of millions in investment into the European clean tech sector.
Funded Companies:
Company name | Funding amount |
8.2 CONSULTING AG | €438,187 |
8.2 MONITORING GmbH | €0.00 |
BIBA - BREMER INSTITUT für PRODUKTION UND LOGISTIK GmbH | €1,411,030 |
DNV Denmark AS | €132,300 |
Danmarks Tekniske Universitet | €1,552,753 |
ENBW ENERGIE BADEN-WURTTEMBERG AG | €249,613 |
EUROS-ENTWICKLUNGSGESELLSCHAFT für WINDKRAFTANLAGEN mbH | €0.00 |
FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG e. V. | €4,000,992 |
GE Energy (UK) Ltd. | €0.00 |
GE RENEWABLE GERMANY GmbH | €0.00 |
GE Wind France SAS | €0.00 |
GERMANISCHER LLOYD INDUSTRIAL SERVICES GmbH | €0.00 |
€11.5M | |
Grid Solutions SAS | €0.00 |
Hitachi Energy Sweden AB | €4,548.25 |
Ingeteam Power Technology SA | €1,009,071 |
JORSS-BLUNCK-ORDEMANN GmbH | €309,925 |
Jan de NUL N.V. | €622,775 |
€0.00 | |
LM Wind Power R&D (Holland) B.V. | €0.00 |
Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek TNO | €1,474,577 |
€1,353,271 | |
Principle Power France | €0.00 |
SENVION GmbH | €318,194 |
SENVION HOLDING GmbH | €0.00 |
Sgurrenergy Ltd. | €9,791.25 |
€0.00 | |
UK Grid Solutions Ltd. | €0.00 |
Uptime Engineering GmbH | €162,515 |
WSP E&IS GmbH | €297,124 |
Wood Group UK Ltd. | €0.00 |
Source: https://cordis.europa.eu/project/id/791875
The filing refers to a past date, and does not necessarily reflect the current state.
The visualizations for "8.2 CONSULTING AG - EU funding (€24.8M): Next Generation 12+MW Rated, Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity" are provided by North Data and may be reused under the terms of the Creative Commons CC-BY license.