EU funding (€12.6M): IP1 Traction TD1 and Brakes TD5 – Phase 2 Hor1 Sept 2018 EU Research and Innovation programme "Horizon"

Overview

Text

IP1 Traction TD1 and Brakes TD5 – Phase 2

The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-CFM-IP1-01-2018 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management. PINTA2 will continue, fully in line with PINTA Phase1, to work on Traction & Adhesion improvements of seven technical and economical KPIs of the Traction system that have been agreed and defined in PINTA (fully in line with S2R KPIs). These performances will be improved on five different train applications having different constraints, needs and specificities, from tramway to HST, including metro, sub-urban, regional trains. In particular, Traction sub-project will address the following KPIs: 1) Line capacity increase through weight, volume and noise savings of Traction equipment. 2) Reduction of Maintenance costs via higher reliability/availability and optimized for maintenance Traction components. 3) Railway system LCC reduction via higher energy efficiency and optimized capital cost of the Traction systems. On Brakes Adhesion side, the work will lead to the achievement of a number of important objectives such as · higherTRL levels of improvement of braking degradation limit in poor adhesion condition · Management of all adhesion conditions in a way that brake distances are optimized · Improvement of the overall train safety, which relies substantially on the management of the wheel/rail contact · Reduction of wheel Life-Cycle-Costs (LCCs) through optimized wheel/rail contact in braking The activities will contribute in developing new performance solutions for Adhesion. The work done in PINTA2 will consist in higher achievement ( up to TRL6) to prepare the final Phase3 work and future TRL7 demonstration on trains, at least Metro, Regional and HST expected around 2021-22.


Funded Companies:

Company name Funding amount
Alstom Rail Sweden AB €929,939
Alstom Transport SA €6,242,484
Caf Power & Automation SL €1,774,138
Centro de Ensayos y Analisis Cetest SL €0.00
Construcciones y Auxiliar de Ferrocarriles Investigacion y Desarrollo SL €0.00
Construcciones y Auxiliar de Ferrocarriles SA €0.00
DB SYSTEMTECHNIK GmbH €0.00
DEUTSCHE BAHN AG €257,751
Faiveley Transport Italia S.p.A. €692,916
KNORR-BREMSE SYSTEME FUR SCHIENENFAHRZEUGE GmbH €443,936
Knorr-Bremse Vasuti Jarmu Rendszerek Hungaria kft. €0.00
NOWE GmbH €0.00
Patentes Talgo SL €839,916
SIEMENS MOBILITY GmbH €1,399,888
SNCF Voyageurs €43,936

Source: https://cordis.europa.eu/project/id/826054

The filing refers to a past date, and does not necessarily reflect the current state.

Creative Commons License The visualizations for "Alstom Rail Sweden AB - EU funding (€12.6M): IP1 Traction TD1 and Brakes TD5 – Phase 2" are provided by North Data and may be reused under the terms of the Creative Commons CC-BY license.