European Companies Search Engine

UK funding (£7,749,932): H1PERBAT - High Performance Battery Pilot Facility Ukri 1 Apr 2017 UK Research and Innovation, United Kingdom

Overview

Text

H1PERBAT - High Performance Battery Pilot Facility

Abstract Led by Williams Advanced Engineering, a consortium including Aston Martin Lagonda, Unipart Powertrain Applications, Warwick Manufacturing Group, National Composites Centre, Coventry University, Aspire Engineering and Productiv, will address the need for high performance electric vehicle (EV) batteries by: 1) realising a novel flexible battery technology with unrivalled module/system performance; and 2) establishing a UK pilot facility for high performance batteries. The H1PERBAT project takes an integrated full life cycle approach to remove constraints on capacity, energy density and thermal management of EV batteries at module and system level to realise a step change in performance for demanding EV applications. The test/optimisation of durability, integrity and safety of technology at cell, module and system level for validated vehicle integration is targeted. The novel pilot facility will realise unique UK capability in module/system-level R&D and scalability to medium production volumes to flexibly target UK/global EV OEMs.
Category BEIS-Funded Programmes
Reference 113128
Status Closed
Funded period start 01/04/2017
Funded period end 31/12/2019
Funded value £7,749,932.00
Source https://gtr.ukri.org/projects?ref=113128

Participating Organisations

FORTESCUE ZERO LIMITED

£3,753,939.00

PRODUCTIV LIMITED

£45,768.00

ASTON MARTIN LAGONDA LIMITED

£1,247,467.00

UNIPART MANUFACTURING LIMITED

£1,185,831.00

COVENTRY UNIVERSITY

£498,385.00

ASPIRE ENGINEERING LIMITED

£134,448.00

NCC OPERATIONS LIMITED

£401,130.00

UNIVERSITY OF WARWICK

£482,963.00

The filing refers to a past date, and does not necessarily reflect the current state. The latest known state is available on the following page: Fortescue Zero Ltd., Kidlington.