European Companies Search Engine

UK funding (£423,473): DD-DSM: Demonstration of Distributed Demand-side Management as a service to the UK grid operator Ukri 1 Jan 2009 UK Research and Innovation, United Kingdom

Overview

Text

DD-DSM: Demonstration of Distributed Demand-side Management as a service to the UK grid operator

Abstract Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details.
Category Collaborative R&D
Reference 200083
Status Closed
Funded period start 01/01/2009
Funded period end 31/12/2010
Funded value £423,473.00
Source https://gtr.ukri.org/projects?ref=200083

Participating Organisations

E.ON UK PLC

£158,514.00

SPACE AIRCONDITIONING PLC

£147,700.00

IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE
NATIONAL GRID ELECTRICITY TRANSMISSION PLC

£23,463.00

LOUGHBOROUGH COLLEGE LOUGHBOROUGH
HORSTMANN GROUP LIMITED

£89,827.00

VIESSMANN LIMITED

£3,969.00

The filing refers to a past date, and does not necessarily reflect the current state. The latest known state is available on the following page: E.on UK Ltd., Nottingham.