European Companies Search Engine

UK funding (£10.6M): POSTIE: Physical Optimisation of Structural Topology for Integrating Engines Ukri 1 Apr 2017 UK Research and Innovation, United Kingdom

Overview

Text

POSTIE: Physical Optimisation of Structural Topology for Integrating Engines

Abstract POSTIE will develop a weight-optimised structural solution for the Rolls-Royce UltraFanTMgeared aero engine and additionally investigate the potential added benefits of topology optimisation.POSTIE is led by Rolls-Royce plc. in partnership with Altair, and will strengthen the UK Fast Make supply chain. The project duration is three years andis due to be completed at the end of Q2 2020.
Category BEIS-Funded Programmes
Reference 113120
Status Closed
Funded period start 01/04/2017
Funded period end 30/06/2021
Funded value £10,597,419.00
Source https://gtr.ukri.org/projects?ref=113120

Participating Organisations

ROLLS-ROYCE PLC

£9,269,242.00

ALTAIR ENGINEERING LIMITED

£1,328,177.00

The filing refers to a past date, and does not necessarily reflect the current state. The latest known state is available on the following page: Rolls-Royce plc, London.