UK funding (£3,164,000): Project 2: High Performance Shaft Machining Ukri 1 Apr 2012 UK Research and Innovation, United Kingdom

Overview

Text

Project 2: High Performance Shaft Machining

Abstract The aim of this project was to develop methods and technologies to deliver step-change improvements in the manufacture of aero-engine shaft components, to achieve reduced cycle times and manual intervention, and improved Right First Time. Such improvements are necessary to enable Rolls-Royce to deliver the volume of shafts required to meet the growing global demand for the Trent XWB. The collaboration with the Advanced Manufacturing Research Centre (AMRC) generated novel cutting strategies, advanced fixturisation, optimised cutting tool configurations, in-cycle inspection, complex computer modelling and dynamic frequency monitoring to machine full-scale shaft components. Traditionally, critical shafts are machined from forgings with low material utilisation rates of typically below 10%. This results in high material input weights and excessive manufacturing time to machine the forgings to final geometry. Working in collaboration with the Advanced Forming Research Centre (AFRC), the project also developed flow forming technology to produce near nett shape shafts. The project significantly exceeded expectations with the Manufacturing Capability Readiness Level (MCRL) raised from 2 to 6 with significant business benefits so far such as: reducing cycle times for shaft machining by 45% against an original target of 30%, reducing manual interventions were reduced by 80% against a target of 50% and raising the feature right first time rate to 99.6%. The High Performance Shaft Machining technology has been successfully implemented into the Rolls-Royce D-site facility in Derby for the manufacture of production mainline shafts and stubshafts. This has led to an increase in productivity enabling the facility to increase UK manufacturing of these critical aerospace components. In addition, this has provided extra workload for the UK SMEs and businesses supplying the tooling, fixtures, services and consumables. The cycle time improvement, the reduction in manual interventions and increase in RFT have been incorporated into a new method of manufacture. “As UK agents for WF we have been very pleased to continue the good relationship with the AFRC. We have supplied new tooling for AFRC. Rolls-Royce projects have extended the knowledge base of AFRC and developed UK knowledge of the possibilities of spinning and flow forming technology. Pearson Panke have had the opportunity of introducing the AFRC to other potential UK users of these technologies.” Pearson Panke Ltd, London (UK rep for WF flow forming machines)
Category Large Project
Reference 110101
Status Closed
Funded period start 01/04/2012
Funded period end 31/12/2015
Funded value £3,164,000.00
Source https://gtr.ukri.org/projects?ref=110101

Participating Organisations

ROLLS-ROYCE PLC

£364,000.00

UNIVERSITY OF STRATHCLYDE

£750,000.00

UNIVERSITY OF SHEFFIELD

£2,050,000.00