UK funding (£7,665,322): AMPLiFII-2 Ukri1 Feb 2018 UK Research and Innovation, United Kingdom

Overview

Text

AMPLiFII-2

Abstract "AMPLiFII 2 is aimed to take the results of the successfully delivered Amplifii project (in the form of a modular, scalable, flexible battery architecture for deployment on low to medium volume vehicle platforms) and accelerate their integration into vehicle products for JLR, JCB, Ariel and ADL. It will take the manufacturing technology developed during Amplifii and adapt it for implementation by the partners. Further, it will develop additional functionality for the AMPLiFII battery system, including 800V high power charging and discharge, location based BMS control, advanced and highly robust cooling, distributed BMS, use of new 21700 cell format, and cost-down measures. The project will result in four fully developed management demonstrator vehicles, a pilot production facility at Delta Motorsport, and a production ready BMS system by Potenza and Trackwise."
Category Collaborative R&D
Reference 104175
Status Closed
Funded period start 01/02/2018
Funded period end 31/07/2020
Funded value £7,665,322.00
Source https://gtr.ukri.org/projects?ref=104175

Participating Organisations

DELTA COSWORTH LIMITED

£2,219,506.00

POTENZA TECHNOLOGY LIMITED

£683,654.00

ALEXANDER DENNIS LIMITED
J.C.B. SERVICE
ARIEL ELECTRIC LTD

£785,872.00

UNIVERSITY OF WARWICK

£2,829,600.00

JAGUAR LAND ROVER LIMITED

£901,795.00

TRACKWISE DESIGNS LIMITED

£244,895.00

The filing refers to a past date, and does not necessarily reflect the current state. The current state is available on the following page: Delta Cosworth Ltd., Northampton.