European Companies Search Engine
EU funding (€3,411,130): Interoperable, modular and Smart hybrid energy STORage systeM for stationarY applications Hor 20 Nov 2020 EU Research and Innovation programme "Horizon"
Overview
Text
Interoperable, modular and Smart hybrid energy STORage systeM for stationarY applications
The iSTORMY project will propose an innovative and interoperable hybrid stationary energy storage system based on: modular battery pack (stacks/modules) + modular power electronics (PE) interface + universal Self-healing energy management strategy (SH-EMS). In particular the project will investigate and demonstrate: 1. Modular battery pack with hybridization at stacks/modules level (incl. slave pBMS) with a new universal BMS (adaptive interfaces + accurate SoX) at the top of the battery system for easy and fast integration and control. The hybridization will consist of different battery types or same type with different capacities (first and second life) and a smart modular solution will be developed to integrate the cooling system among modules or stacks. 2. Modular PE interface based on SiC devices with high efficiency (topology + adaptive local controller) and Digital Twin modeling. 3. Universal SH-EMS (based on machine learning and online algorithms) including the aging and thermal constraints for failure mechanisms.
Funded Companies:
| Company name | Funding amount |
| AIT Austrian Institute OF Technology GmbH | €198,938 |
| Cegasa Energia SL | €296,571 |
| Commissariat a L Energie Atomique et aux Energies Alternatives | €304,730 |
| Electricite de France | €359,875 |
| Greenway Infrastructure s.r.o. | €100,500 |
| Mondragon Goi Eskola Politeknikoa Jose Maria Arizmendiarrieta S Coop | €312,938 |
| Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek TNO | €351,425 |
| Powerdale | €150,236 |
| Prodrive Technologies B.V. | €308,416 |
| Prodrive Technologies Innovation Services B.V. | €0.00 |
| Uniresearch B.V. | €161,563 |
| Vrije Universiteit Brussel | €573,814 |
| Zigor Research & Development AIE | €292,125 |
Source: https://cordis.europa.eu/project/id/963527
The filing refers to a past date, and does not necessarily reflect the current state.