European Companies Search Engine
UK funding (£238,170): Electrical and thermal storage optimisation in a virtual power plant Ukri1 Nov 2017 UK Research and Innovation, United Kingdom
Overview
Text
Electrical and thermal storage optimisation in a virtual power plant
| Abstract | Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details. |
| Category | Feasibility Studies |
| Reference | 132934 |
| Status | Closed |
| Funded period start | 01/11/2017 |
| Funded period end | 30/04/2019 |
| Funded value | £238,170.00 |
| Source | https://gtr.ukri.org/projects?ref=132934 |
Participating Organisations
| UNIVERSITY OF SUSSEX (THE) |
£80,083.00 |
| DURHAM UNIVERSITY |
£52,740.00 |
| UK POWER NETWORKS SERVICES HOLDINGS LIMITED | |
| MOIXA TECHNOLOGY LIMITED |
£58,444.00 |
| SUNAMP LIMITED |
£46,903.00 |
The filing refers to a past date, and does not necessarily reflect the current state. The current state is available on the following page: University OF Sussex, Brighton.
The visualizations for "University of Sussex - UK funding (£238,170): Electrical and thermal storage optimisation in a virtual power plant"
are provided by
North Data
and may be reused under the terms of the
Creative Commons CC-BY license.