EU funding (€16.7M): Wind Hybrid Evolution for Low-Carbon Solutions Hor16 Dec 2022 EU Research and Innovation programme "Horizon"
Overview
Text
Wind Hybrid Evolution for Low-Carbon Solutions
The overall objective of the WHEEL project is to fully demonstrate and bring to a precommercial Technology Readiness Level (TRL) a revolutionary floating wind technology excellently suited for deep water locations, effective industrialization strategies, breakthrough cost reduction and minimized carbon footprint. This shall enable a radical step forward for LCoE reduction, whilst also addressing scalability, harbour infrastructure suitability and availability, and the sustainability & circularity of floating offshore wind. Development and demonstration needed to reach the pursued TRL will be achieved through the design, installation, certification and testing of a fully operative 6MW Pilot unit, which will showcase and demonstrate the breakthrough advantages that the WHEEL technology can deliver to the floating wind industry. It will be installed in a deep-water location in the PLOCAN testing area (Canary Islands, Spain), where it shall be thoroughly monitored along a period sufficient to underpin the commercialization and bankability of the technology. The WHEEL project pulls together a Consortium of renowned European companies and research institutions with extensive experience and a spearhead position in the renewables and marine industry. This multidisciplinary team joins forces to complete the full demonstration of such a disruptive technology by integrating complementary expertise fields and capabilities which effectively cover all key areas of floating wind systems in pursuit of the ambitious objectives of the project.
Funded Companies:
| Company name | Funding amount |
| Bridon International Ltd. | ? |
| 2-B ENERGY GmbH | €0.00 |
| 2-B ENERGY HOLDING B.V. | €3,889,314 |
| 2-B Energy SL | €0.00 |
| Bekaert Wire Rope Industry N.V. | €8,873.58 |
| BOSKALIS OFFSHORE MARINE SERVICES B.V. | €61,900 |
| Consorcio para El Diseno, Construccion, Equipamiento y Explotacion de La Plataforma Oceanica de Canarias | €225,000 |
| Coremarine AS | €0.00 |
| Coremarine Solutions SL | €1,850,400 |
| ENBW ENERGIE BADEN-WURTTEMBERG AG | €0.00 |
| Esteyco Canarias SL | €0.00 |
| Esteyco SA | €6,665,096 |
| Fundacion Instituto de Hidraulica Ambiental de Cantabria | €191,550 |
| Reparaciones Navales Canarias SA | €1,525,433 |
| Rover Maritime SL | €1,651,216 |
| Vicinay Sestao SL | €595,167 |
Source: https://cordis.europa.eu/project/id/101084409
The filing refers to a past date, and does not necessarily reflect the current state. The current state is available on the following page: Bridon International Ltd., Doncaster.
The visualizations for "Bridon International Ltd. - EU funding (€16.7M): Wind Hybrid Evolution for Low-Carbon Solutions"
are provided by
North Data
and may be reused under the terms of the
Creative Commons CC-BY license.